-
07/06/2018 4th June 2018 - Start of a new project in Stuttgart, Germany In Stuttgart one of the biggest infrastructural project in Europe takes place, the so-called Stuttgart 21. The old railway main station is going to be replaced underground, with the dead-end-station... Read more
-
31/05/2018 Breakthrough of the road tunnel near Gabrovo, part of Road III – 5004 Bypass of the town of Gabrovo On May 24th, 2018, the breakthrough of the road tunnel to the town of Gabrovo, part of road III – 5004 “Bypass of the town of Gabrovo, with a length of 540m and a cross section of 74.6 m2, was... Read more
-
22/03/2018 Euro Alliance with two prestigious awards from "Infrastructure Bulgaria Awards 2018" On 20th of March 2018 Euro Alliance received prestigious awards in two categories – the most successful infrastructure project and the most successful international infrastructure project in the... Read more
-
16/03/2018 Breakthrough of the tunnel between Ventilation system shaft and MS6, part of the Third metro diameter of the Sofia metro project On the third of March 2018, the tunnel between the Ventilation system shaft (vertical shaft with cross section of 380 m2 and depth of 17 meters) and the Metro Station 6 with a length of 445 meters and... Read more
-
22/02/2018 Completion of the secondary lining of the U3 subway tunnel, Nürnberg, Germany In the middle of February 2018 we completed the construction of the secondary lining of the U3 subway in Nürnberg, Germany. The lining consists of more parts - one-track tubes, twin-track tube,... Read more
-
26/01/2018 Minister Zorana Mihajlovic's visit to the Predejane tunnel, Serbia Deputy Prime Minister and Minister of Construction of the Republic of Serbia, Zorana Mihajlovic, visited the Predejane tunnel to make sure the project progressed. The schedule and the fact that the... Read more
-
19/01/2018 Break through at tunnel Vötting in Freising, Bavaria Shortly after welcoming the new year 2018 we broke through the calotte of tunnel Vötting. The part built with NATM was 458 m long, with cross section around 100 sqm. In the upcoming weeks the works... Read more