Engineering
Tunneling
Steel constructions
Design
Geotechnical facilities
25 years

News

Reconstruction of Railway section Schwarzwald... In the beginning of September we started with the execution of a new project in southern Germany. Five tunnels with total length 1.236 m have to be reconstructed:... more...
Breakthrough of the tunnel between Metrostation... The metro tunnel, which connects MS 6 on Madrid Boulevard with MS 5 on Vladimir Vazov Blvd. at Chavdar Bridge was broken through. The tunnel has a length of 675 meters and a... more...

Contacts

Head office
Euro Alliance Engineering JSC,
6 Alexander Zhendov Str., fl. 6
1113 Sofia, Bulgaria
T + 359 2 807 31 10
T + 359 2 807 31 11
F + 359 2 807 31 33
e-mail: [email protected]еае.bg