Metro station 8 II, Second metro diameter, Sofia, Bulgaria

Tunnel constructions - New Austrian Tunneling Method /The Metro station was built in tunneling method/

Activity: Drilling and reinforcement, isolation and inner concrete

Techical data L = 108 m, ∅ = 258 sq.m.
Year 2010 - 2011