Railway tunnel “Blessberg”, Lot 2 and Lot 3, Germany
Tunnel constructions - New Austrian Tunneling Method
- Length = 8.314 m., Profile = 122 m2, Usable space after finish - 92 m2
- Activity: Drilling and reinforcement
- Emergency exits with total length of 4477 m.