Metro tunnel between MS 10 and MS 11, Sofia, Bulgaria

Tunnel constructions - New Austrian Tunneling Method

  • Length = 718 m., Profile = 75 m2
  • Activity: Drilling and reinforcement, isolation and inner concrete
Techical data L = 718 m, ∅ = 75 sq.m.
Year 2009 - 2010