Metro station 8 II, Sofia, Bulgaria

Tunnel constructions - New Austrian Tunneling Method /The Metro station was built in tunneling method/

  • Length = 108 m, Profile = 258 m2
  • Activity: Drilling and reinforcement, isolation and inner concrete
Techical data L = 108 m, ∅ = 258 sq.m.
Year 2010-2011