Construction of barrage through a wall consisted of cast-in piles unifyied by reinforced concrete structure, HPP Lisec
- Clearing and leveling of the construction site /the river bed/;
- Construction of reinforced concrete cast-in piles Ø 880 mm, L = 5÷9 m, 86 pcs;
- Construction of reinforced concrete cast-in piles Ø 500 mm, L = 4 m, 12 pcs;
- Construction of the reinforcement and the formwork;
- Concreting of the unifying reinforced concrete structure and removal of the formwork.